Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 8 results ...

Adefila, A, Abuzeinab, A, Whitehead, T and Oyinlola, M (2020) Bottle house: utilising appreciative inquiry to develop a user acceptance model. Built Environment Project and Asset Management, 10(04), 567–83.

Carrière, S, Weigend Rodríguez, R, Pey, P, Pomponi, F and Ramakrishna, S (2020) Circular cities: the case of Singapore. Built Environment Project and Asset Management, 10(04), 491–507.

Crippa, J, Araujo, A M, Bem, D, Ugaya, C M and Scheer, S (2020) A systematic review of BIM usage for life cycle impact assessment. Built Environment Project and Asset Management, 10(04), 603–18.

Okorafor, C, Emuze, F, Das, D, Awuzie, B O and Haupt, T (2020) An artefact for improving the delivery of building energy retrofit project in South Africa. Built Environment Project and Asset Management, 10(04), 619–35.

Omotayo, T, Olanipekun, A, Obi, L and Boateng, P (2020) A systems thinking approach for incremental reduction of non-physical waste. Built Environment Project and Asset Management, 10(04), 509–28.

  • Type: Journal Article
  • Keywords: Continuous improvement; Cost control; Cost reduction; Post-contract; Systems thinking;
  • ISBN/ISSN: 2044-124X
  • URL: https://doi.org/10.1108/BEPAM-10-2019-0100
  • Abstract:
    Continual cost reduction of overhead costs of building projects can realign the concept of post-contract cost control towards value-driven construction projects and stakeholders’ satisfaction. This study synthesised and analysed the viable continuous improvement measures critical for waste reduction during the execution phase of a building project.Design/methodology/approach A review of existing literature facilitated a list of continuous improvement measures. This literature review findings enabled a Likert-scale questionnaire which was administered to two-hundred and fifty (250) small- and medium-scale construction companies (SMSCC) in Nigeria. Multiple linear regression statistical tests deduced the significant cost reduction measure from which a causal loop diagram was designed to indicate continuous improvement measures during the execution phase of a building project.Findings Cogent construction activities associated with overhead costs were deduced from the statistical tests as being payment of suppliers and sub-contractors and purchase orders. An all-inclusive casual loop model for cost reduction through waste minimisation in construction projects as a viable oriented mechanism for meeting clients' requirements was developed.Practical implications The causal loop continuous improvement model recognised external and internal factors which are crucial for SMSCC to focus on for their organisational growth and performance enhancement.Originality/value A focus on non-physical waste in construction organisations potentially addresses behavioural challenges for continuous improvement.

Osunsanmi, T O, Aigbavboa, C O, Emmanuel Oke, A and Liphadzi, M (2020) Appraisal of stakeholders' willingness to adopt construction 4.0 technologies for construction projects. Built Environment Project and Asset Management, 10(04), 547–65.

Weigend Rodríguez, R, Pomponi, F, Webster, K and D'Amico, B (2020) The future of the circular economy and the circular economy of the future. Built Environment Project and Asset Management, 10(04), 529–46.

Windapo, A O and Moghayedi, A (2020) Adoption of smart technologies and circular economy performance of buildings. Built Environment Project and Asset Management, 10(04), 585–601.